Menu

Delta Airways 360 Lounge

London, England

This 6 week project incorporated a new partnership with London’s leading design organisation, Zero Collective to formulate the new luxury Delta Airways Lounge. The project consisted of stripping out, re-modelling and refurbishing the existing ground floor Hotel area to form the new Delta Airways Lounge.

Our in-house team provided CAD and engineering initiatives, high quality joinery fabrication and installation, furnishings, sprinkler system, complete mechanical and electrical services, lighting control system, implementation of the music system and specialist polished concrete floor effect from the external runway which followed on throughout the entrance hallway and leading into the lounge with the final implementation of the eye catching feature mirror in the bar area.

As a direct result of Cumberland’s exceptional results and impeccable service at the Delta Airways Lounge, we were immediately appointed to refurbish the Delta Airways Executive Box.