Cumberland Group

Frederic Malle

Burlington Arcade is a truly timeless destination in the heart of Mayfair, an iconic runway linking Piccadilly and Bond Street. This project consisted of the full strip out of the existing shop unit and complete shop fit out. The works here included the installation off; back of house and toilet areas, new lighting and electrics, […]

Liberty London

Various works during 2017 including Menswear Department refurbishment and Frederic Malle concession strip out and refurbishment Cumberland have undertaken the refurbishment of the menswear department in the basement area of London’s luxury department store, Liberty. The works have involved alterations to the room layouts and changing room locations to incorporate the new design along with […]

Hershesons

Cumberland were delighted to work with Retail Design Agency GP Studio again, on the fit out of Hershesons’ 5,000 sq ft flagship salon in London’s Fitzrovia. Over the 14 week programme the Cumberland team managed every aspect of the fit out of the initially empty unit. Works included HVAC, Plumbing, Electrical, Partitions, New Shopfront, Bespoke […]

Fortnum and Mason

During 2016 Cumberland undertook the manufacture and installation of various joinery items for Fortnum and Mason within their flagship store at 181 Piccadilly. Tea Sensory Table, Tea Tasting Station, Teaware Tables and the Preserves Wall were all manufactured in house, with the emphasis on high quality finishes which required skilled joinery techniques and attention to […]

Twinings

Cumberland Carried out the full refurbishment of the whole store, including new specialist display unity, new bespoke joinery items manufactured in house ( cash and wrap counters, tasting bars, curiosity bays) also creating a tea tasting room in the basement, works also included whole new services, Electrical, HVAC, alarms, Access control, alarms, and full sign […]

Kiehls

Complete design and build on behalf of the brand to take an empty new build unit and refurbish into the completed store. Design an installation of all mechanical and Electrical installationsStructural design for feature bulkheads. Landlords approval and design process for completed by Cumberland for and on behalf of the client.

MAC Liverpool

Complete design, manufacture and installation of the joinery unitary for the new store. Complete fabrication of joinery including metalwork fabrication, glass and electrical and lighting installation. All fabricated in our state of the art essex based joinery workshop. Manufacture and design process 12 weeks from order.

Harrods Knightsbridge

Cumberland has established an admirable relationship with Harrods, which is largely credited to the open and honest approach to working with the project team from the outset. As a result of our professional approach and willingness to assist Harrods with every detail, Cumberland was awarded a number of significant projects during 2013. The Wine & […]

Boadicea The Victorious – Harrods

For this project, Cumberland completed the design, manufacture and installation of the joinery unitary for the new store. This included the fabrication of joinery such as metalwork, glass and electrical fabrication as well as lighting installation, all of which were fabricated in our state of the art Essex based joinery workshop.

Victoria Road

This 15 month full design and build high end residential project in Kensington included full mechanical and electrical design and build – including specialist joinery, Specialist AV installation, Swimming pool, Wine cellar, Gym and external landscaping.